Guides for solar and storage logistics
What you should clarify before a solar or storage transport. The dangerous goods guides refer to ADR 2025; the data sheet and manufacturer instructions remain decisive.
Guides
- Palletising modulesPreparing solar panels for transport: manufacturer packaging, edge protection, strapping, pallet condition and labelling – what counts before collection.
- Transport damageTransport damage to solar panels: visual check at delivery, reservation on the consignment note, photos, reporting concealed damage in time.
- Load securingLoad securing for solar modules and energy equipment: form fit, anti-slip mats, lashing per VDI 2700 and edge protection – who is responsible for what.
- Site accessPreparing a solar farm site for trucks: ground, site road, turning space, clearance heights, unloading point and buffer areas.
- Details for a quoteDetails for a solar and storage transport quote: route, date, pallets, weight, unloading and, for batteries, Wh, UN number and condition.
- Battery shipping checklistChecklist for shipping storage batteries: watt-hours not state of charge, SP 188, UN number and label 9A, markings for SP 376/377 and tunnel code (E).
- 1.1.3.6 exemptionADR 1.1.3.6 for battery storage: category 2, up to 333 kg battery mass per transport unit – what is waived, what remains and when the threshold does not apply.
- Damaged batteries (SP 376)Damaged or defective lithium batteries under ADR SP 376: who assesses, packing P908 or P911, category 0 under SP 677, marking and document.
- UN 3536 and SP 389UN 3536 lithium batteries installed in cargo transport units: conditions of SP 389, marking with class 9 placards and orange plates, changes in ADR 2027.
- State of chargeState of charge (SoC) when shipping batteries: No ADR limit, air freight up to 30 % by packing instruction, sea freight separate – plus manufacturer rules.
- UN 38.3 test summaryUN 38.3 test summary for lithium batteries: what it proves, who provides it, why untested batteries are not carried – and SP 310.
- Delivery bookingBooking, delivery windows and reception for solar deliveries: who is informed, what a window means and how waiting time is covered in the quote.
- Switzerland, Norway, UKModules and batteries to Switzerland, Norway and the UK: customs declaration, documents, dangerous goods on top – clarified before quoting.
- Batteries by sea or airBattery storage by ship or plane: IMDG Code and IATA rules instead of ADR, state of charge, damaged batteries – and our part on the road.
- Delivery without forkliftDelivering single pallets without a forklift: truck with tail lift, pallet truck, passable ground, kerbside or an agreed handover point.
Frequently asked questions
Which edition do the dangerous goods guides refer to?
They refer to ADR 2025. ADR 2027 applies from 1 January 2027; ADR 2025 may still be applied until 30 June 2027.
Do the guides replace dangerous goods advice?
No. They show what matters for planning. For classification and packaging the ADR text, data sheet and manufacturer instructions are decisive.
Ready to plan?
Send us the key data – route, date and what is being transported. Anything you do not know yet can be left open.