Guides
Shipping batteries: ADR checklist
Before every battery shipment the same questions arise: is it dangerous goods at all, how is it marked, what goes in the document and which route works? This checklist bundles the points under ADR 2025 that most often go wrong with energy storage.
What matters
- Watt-hours, not state of charge
- Whether special provision 188 applies is decided by the rated energy: up to 20 Wh per cell and 100 Wh per battery. A half-discharged battery stays what it is.
- Marking
- Fully regulated: UN number and label 9A. Only under SP 188: lithium battery mark with UN number instead of the label.
- Markings in special cases
- Damaged: “DAMAGED/DEFECTIVE LITHIUM ION BATTERIES”. For disposal: “LITHIUM BATTERIES FOR DISPOSAL” or “FOR RECYCLING”.
- Tunnel code (E)
- Applies only if the vehicle must display orange plates – then category E tunnels are closed.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- How many Wh does each battery have per type plate?
- Is the shipment fully regulated or exempted under SP 188?
- Are all packages correctly marked?
- Must the vehicle display orange plates, and is there a category E tunnel on the route?
What we need from you
- Data sheet with Wh
- UN number
- Total battery mass
- Battery condition
Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.
What we do for you
What we organise
- Road transport for PV modules, inverters, mounting systems and battery storage across Europe
- Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
- For battery storage we clarify UN number, packaging and documents before quoting
Good to know
Classification and marking are based on the data sheet and manufacturer information. Status: ADR 2025; from 1 January 2027 ADR 2027 applies (transition until 30 June 2027).
Further reading: Transporting lithium batteries: rules at a glance (in German, adr-spedition.de)
How it works
- 01
Request
You send route, date, product group and quantity using the form – anything unknown can stay open.
- 02
Review
We go through the checklist with your details and clarify open points before quoting.
- 03
Quote
You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.
- 04
Execution
Acceptance only with complete marking and transport document.
Questions and answers: Battery shipping checklist
Does a discharged battery fall under the 100 Wh exemption?
No. The rated energy in Wh counts, not the current state of charge. Batteries above 100 Wh per battery are fully regulated.
Which label goes on a home battery?
The UN number, for example “UN 3480”, and label 9A. The lithium battery mark only applies to small batteries exempted under SP 188.
Does the tunnel code always apply?
No. Code (E) only counts for vehicles that must display orange plates. Below the 1.1.3.6 threshold there is no tunnel restriction.
Request
Request for this topic: Battery shipping checklist
Three steps. Anything you do not know yet can be left open.
Details for planning
- Data sheet with Wh
- UN number
- Total battery mass
- Battery condition