Solar-Spedition

Guides

Shipping batteries: ADR checklist

Before every battery shipment the same questions arise: is it dangerous goods at all, how is it marked, what goes in the document and which route works? This checklist bundles the points under ADR 2025 that most often go wrong with energy storage.

What matters

Watt-hours, not state of charge
Whether special provision 188 applies is decided by the rated energy: up to 20 Wh per cell and 100 Wh per battery. A half-discharged battery stays what it is.
Marking
Fully regulated: UN number and label 9A. Only under SP 188: lithium battery mark with UN number instead of the label.
Markings in special cases
Damaged: “DAMAGED/DEFECTIVE LITHIUM ION BATTERIES”. For disposal: “LITHIUM BATTERIES FOR DISPOSAL” or “FOR RECYCLING”.
Tunnel code (E)
Applies only if the vehicle must display orange plates – then category E tunnels are closed.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. How many Wh does each battery have per type plate?
  2. Is the shipment fully regulated or exempted under SP 188?
  3. Are all packages correctly marked?
  4. Must the vehicle display orange plates, and is there a category E tunnel on the route?

What we need from you

  • Data sheet with Wh
  • UN number
  • Total battery mass
  • Battery condition

Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.

What we do for you

What we organise

  • Road transport for PV modules, inverters, mounting systems and battery storage across Europe
  • Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
  • For battery storage we clarify UN number, packaging and documents before quoting

Good to know

Classification and marking are based on the data sheet and manufacturer information. Status: ADR 2025; from 1 January 2027 ADR 2027 applies (transition until 30 June 2027).

Further reading: Transporting lithium batteries: rules at a glance (in German, adr-spedition.de)

How it works

  1. 01

    Request

    You send route, date, product group and quantity using the form – anything unknown can stay open.

  2. 02

    Review

    We go through the checklist with your details and clarify open points before quoting.

  3. 03

    Quote

    You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.

  4. 04

    Execution

    Acceptance only with complete marking and transport document.

Questions and answers: Battery shipping checklist

Does a discharged battery fall under the 100 Wh exemption?

No. The rated energy in Wh counts, not the current state of charge. Batteries above 100 Wh per battery are fully regulated.

Which label goes on a home battery?

The UN number, for example “UN 3480”, and label 9A. The lithium battery mark only applies to small batteries exempted under SP 188.

Does the tunnel code always apply?

No. Code (E) only counts for vehicles that must display orange plates. Below the 1.1.3.6 threshold there is no tunnel restriction.

Request

Request for this topic: Battery shipping checklist

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Data sheet with Wh
  • UN number
  • Total battery mass
  • Battery condition

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date
Where is it delivered? (optional)

What is being transported?

Quantity
Total weight
Does the shipment contain lithium batteries?

For lithium batteries we clarify the UN number and documents after your request.

You can send data sheets or packing lists after our first reply – no upload is needed here.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.