Solar-Spedition

Guides

UN 3536 and SP 389 explained simply

Container storage is not a set of packages with batteries but a separate ADR entry: UN 3536. Special provision 389 sets when it applies and what must be visible on the container. Anyone shipping a BESS container should clarify these points before booking.

What matters

When UN 3536 applies
The batteries are installed in the cargo transport unit and designed only to provide power outside it. They meet the conditions of 2.2.9.1.7.1 and have protection against overcharge and over-discharge.
Fastening
The batteries are secured in racks or cabinets so that short circuits, accidental operation and significant movement are prevented.
Marking
Batteries inside: none. Container: except where 1.1.3.6 applies, orange plates and placards of model 9 on two opposite sides – model 9A is not permitted as a placard.
ADR 2027
From 2027, UN 3536 reads “lithium ion batteries installed in cargo transport unit”; lithium metal and sodium-ion variants get their own numbers, plates go on each long side.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Are the batteries installed and only for power outside?
  2. Are manufacturer details on overcharge and over-discharge protection available?
  3. Are placards and plates prepared?
  4. Are other goods inside the container?

What we need from you

  • Data sheet and manufacturer declaration
  • Dimensions and weight
  • Marking
  • Collection and destination

Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.

What we do for you

What we organise

  • Road transport for PV modules, inverters, mounting systems and battery storage across Europe
  • Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
  • For battery storage we clarify UN number, packaging and documents before quoting

Good to know

ADR 2025 may still be applied until 30 June 2027. Sea transport is governed by its own IMDG Code rules.

How it works

  1. 01

    Request

    You send route, date, product group and quantity using the form – anything unknown can stay open.

  2. 02

    Review

    We check the conditions of SP 389 and the marking before confirming feasibility.

  3. 03

    Quote

    You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.

  4. 04

    Execution

    Acceptance only with marking under SP 389 and without non-operational dangerous goods in the container.

Questions and answers: UN 3536 and SP 389

What is UN 3536?

The ADR entry for lithium batteries installed in a cargo transport unit that supply power outside it – typically containerised battery storage.

Which placard belongs on a BESS container?

The class 9 placard of model 9 on two opposite sides, plus orange plates. Model 9A must not be used as a placard.

May other dangerous goods travel inside the storage container?

No. Dangerous goods not needed for operation must not be carried in the container; operational ones such as fire suppression must be properly installed.

Request

Request for this topic: UN 3536 and SP 389

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Data sheet and manufacturer declaration
  • Dimensions and weight
  • Marking
  • Collection and destination

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date
Where is it delivered? (optional)

What is being transported?

Quantity
Total weight
Does the shipment contain lithium batteries?

For lithium batteries we clarify the UN number and documents after your request.

You can send data sheets or packing lists after our first reply – no upload is needed here.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.