Solar-Spedition

Guides

UN 38.3 test summary: what consignors need

As a rule, lithium batteries may only be carried if their type has passed the tests of the UN Manual of Tests and Criteria, section 38.3. The test summary proves this; different rules apply to prototypes (SP 310), damaged (SP 376) and waste batteries (SP 377). For battery consignors it is one of the first documents we ask for.

What matters

What it proves
That the cell and battery type has passed the 38.3 tests – the battery as a whole, not only its cells.
Who provides it
Manufacturers and subsequent distributors of cells and batteries manufactured after 30 June 2003 must make it available.
Quality management
In addition, cells and batteries must be manufactured under a quality management programme; third-party certification is not required for this.
Without testing
Pre-production prototypes and small series up to 100 units travel under special provision 310 with packing instruction P910 – a special case.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Is the test summary available for the exact type?
  2. Does the model designation match the goods?
  3. Are these series goods or prototypes?
  4. Who is manufacturer or distributor?

What we need from you

  • Test summary
  • Type and model designation
  • Data sheet
  • Series or prototype

Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.

What we do for you

What we organise

  • Road transport for PV modules, inverters, mounting systems and battery storage across Europe
  • Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
  • For battery storage we clarify UN number, packaging and documents before quoting

Good to know

The test summary need not travel with the goods but must be available on request. Keep it ready per type.

How it works

  1. 01

    Request

    You send route, date, product group and quantity using the form – anything unknown can stay open.

  2. 02

    Review

    We compare type and model on the test summary with your goods.

  3. 03

    Quote

    You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.

  4. 04

    Execution

    Acceptance of series goods with testing in place; prototypes only after separate clarification.

Questions and answers: UN 38.3 test summary

What is a UN 38.3 test summary?

A manufacturer document summarising that the battery type has passed the tests of UN Manual section 38.3.

Must the test summary accompany the transport?

ADR requires manufacturers and distributors to make it available. For planning we ask for it anyway.

What applies to prototypes without testing?

They fall under special provision 310 and packing instruction P910. We check these cases separately per request.

Request

Request for this topic: UN 38.3 test summary

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Test summary
  • Type and model designation
  • Data sheet
  • Series or prototype

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date
Where is it delivered? (optional)

What is being transported?

Quantity
Total weight
Does the shipment contain lithium batteries?

For lithium batteries we clarify the UN number and documents after your request.

You can send data sheets or packing lists after our first reply – no upload is needed here.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.