Solar farm access and unloading

A fully loaded truck needs firm ground, room to turn and an unloading point where work can happen. On solar farm sites that is not a given. A few photos and details in advance avoid waiting time and getting stuck.

What matters

Ground
Unpaved areas quickly become impassable after rain. Site roads or panels help.
Turning and manoeuvring
Can the truck turn or must it reverse out? That determines vehicle length and procedure.
Heights and narrow points
Bridges, lines, gates: state clearance heights and widths in advance.
Buffer area
Where may goods be placed if more arrives than is installed immediately? You clarify this area with site management.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Is there a paved site road to the unloading point?
  2. Can the truck turn?
  3. Which clearance heights and widths are there?
  4. Where is the buffer area?

What we need from you

  • Site plan or coordinates
  • Photos of the access
  • Heights and widths
  • Unloading and buffer area

Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.

What we do for you

What we organise

  • Road transport for PV modules, inverters, mounting systems and battery storage across Europe
  • Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
  • For battery storage we clarify UN number, packaging and documents before quoting

Good to know

We do not offer interim storage as standard. If access is impassable, we agree a new date.

How it works

  1. 01

    Request

    You send route, date, product group and quantity using the form – anything unknown can stay open.

  2. 02

    Review

    Based on your photos and details we check vehicle and procedure.

  3. 03

    Quote

    You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.

  4. 04

    Execution

    Approach via the agreed route, unloading at the agreed point.

Questions and answers: Site access

What do you need to assess the access?

A site plan or coordinates of the entrance, photos of the route to the unloading point and details of heights and narrow points.

What happens if the truck cannot reach the unloading point?

Then unloading takes place at the nearest reachable point or is replanned. We agree this on site with site management.

Do you store goods until the site is ready?

Not as standard. We check per request whether interim storage is feasible for your project.

Request

Request for this topic: Site access

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Site plan or coordinates
  • Photos of the access
  • Heights and widths
  • Unloading and buffer area

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date
Where is it delivered? (optional)

What is being transported?

Quantity
Total weight
Does the shipment contain lithium batteries?

For lithium batteries we clarify the UN number and documents after your request.

You can send data sheets or packing lists after our first reply – no upload is needed here.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.