How a solar and storage transport works
Four steps – and before every quote, clarity on what is loaded, whether dangerous goods are involved and how unloading works at destination.
- 01
Request
You tell us route, time frame, product group, pallets and weight. Missing values can be marked as “not known yet”.
- 02
Review
We check vehicle, load securing and unloading point. For storage systems we compare watt-hours, UN number and packaging with the data sheet and ask specific questions.
- 03
Quote
The quote states the agreed scope: transport, delivery window, unloading and – for dangerous goods – which documents and marking must be in place.
- 04
Execution
Collection on the agreed date, secured transport and delivery with delivery note – visual check of the goods at handover.
Modules: glass on pallets
PV modules are heavy glass panels in manufacturer packaging. What matters is pallet weight, edge protection, strapping and an unloading point where a forklift or pallet truck can work. Check for visible damage at delivery and note it on the consignment note.
Storage: dangerous goods class 9
Lithium-ion storage above 100 watt-hours per battery is fully regulated class 9 dangerous goods under ADR (UN 3480 or UN 3481). For the quote we need the data sheet, the total battery weight and the condition. Whether a dangerous goods vehicle is required depends among other things on the battery mass per transport unit.
Construction site and solar park
On sites, access, ground conditions and reception count. We agree a delivery window and clarify in advance who unloads and where. We check per request whether a crane or truck-mounted forklift can be provided.