Leipzig is the seat of the European energy exchange, and in the area south of Leipzig solar parks are being built on former lignite mining land. For logistics these are large sites with many call-offs, long site roads and little storage space.
Leipzig: economy and locations
Energy has been traded in Leipzig since the first power trade on 15 June 2000; today the city is the seat of the European energy exchange. Around 30 kilometres south lies one of Europe's largest solar parks: 605 megawatts, around 1.1 million modules on about 500 hectares of former lignite land.
Projects of this size show what matters for delivery: call-offs by construction progress, site roads across reclaimed land and a reception that checks delivery notes and quantities cleanly.
Key facts
| Fact | Source |
|---|---|
| Seat of the European energy exchange; the first power trade on its predecessor took place on 15 June 2000 | Energy exchange, press release 2025 (As of 2025) |
| Around 30 km south lies one of Europe's largest solar parks with 605 MW | Leipziger Internet Zeitung (As of 2024) |
| The solar park comprises around 1.1 million modules on about 500 hectares of former lignite mining land | pv magazine (As of 2024) |
Typical shipments in Leipzig
- Call-offs with module pallets to a solar park site south of Leipzig
- Mounting structures and ramming posts for construction phases
- Inverter stations and cable drums for the grid connection
Things to note on site
Former open-cast mining areas have soft, partly sandy ground; site roads and turning space are decisive. Call-offs and delivery windows are agreed with site management; we need the coordinates of the entrance in advance. We check per request whether unloading equipment can be provided.
Questions and answers: Leipzig
Do you deliver to solar park sites south of Leipzig?
Yes, on request – with call-off planning, an agreed delivery window and an access check in advance.
What should be considered on former mining land?
Soft ground and long site roads. Photos, coordinates and notes on turning space help choose the vehicle.
Request
Request for Leipzig
Three steps. Anything you do not know yet can be left open.
Details for planning
- Collection and destination with country
- Preferred time frame
- Product group: modules, inverters, storage, mounting systems
- Number of pallets or pieces and total weight
- For storage: watt-hours per battery and UN number from the data sheet
- Delivery point: warehouse, site or solar park
- Unloading: available on site or still to be clarified