City · Germany
Solar logistics in Bitterfeld-Wolfen
In Bitterfeld-Wolfen, in the district of Thalheim, the “Solar Valley” developed from 2007 – one of the best-known industrial areas of the German solar industry. The site stands for the history of module and cell manufacturing in central Germany; since 2024 it has also been home to a refinery for battery-grade lithium.
Bitterfeld-Wolfen: economy and locations
In 2007 the first thin-film production line in Solar Valley celebrated its topping-out; in 2011 module manufacturing began at the Thalheim site. For years the industrial area was a centre of cell and module production.
The battery supply chain is now represented as well: in 2024 Europe's first lithium refinery started operating in Bitterfeld-Wolfen. It produces battery-grade lithium hydroxide, a raw material for cathode material; the first of several planned modules is designed for 20,000 tonnes a year.
For logistics, the region between Leipzig, Halle and Dessau is a hub with industrial and chemical sites, warehouse space and short routes to solar projects in Saxony-Anhalt and Saxony.
Key facts
| Fact | Source |
|---|---|
| From 2007 the “Solar Valley”, an industrial area of the solar industry, developed in the district of Thalheim | Solarserver (2007) (As of 2007) |
| In 2024 Europe's first lithium refinery started operating in Bitterfeld-Wolfen; the first module has an annual capacity of 20,000 t of lithium hydroxide | pv magazine (2024) (As of 2024) |
| In 2011 module manufacturing began at the Thalheim site | Solarserver (2011) (As of 2011) |
Typical shipments in Bitterfeld-Wolfen
- Module pallets from a warehouse near Bitterfeld to installers
- Mounting systems for solar farms in Saxony-Anhalt
- Pallet goods between industrial sites in the chemical triangle
Things to note on site
The industrial areas lie conveniently on the motorway between Leipzig and Dessau. Plant sites have their own access rules and receiving hours; we clarify these in advance. For solar farms nearby the notes on access and call-offs apply as for any site.
Questions and answers: Bitterfeld-Wolfen
Do you deliver modules to the Bitterfeld-Wolfen area?
Yes, to warehouses, installers and projects – with agreed unloading and receiving hours.
Is there still solar manufacturing there?
We do not describe the current status of individual plants. The city page describes the history of the site with sources.
Request
Request for Bitterfeld-Wolfen
Three steps. Anything you do not know yet can be left open.
Details for planning
- Collection and destination with country
- Preferred time frame
- Product group: modules, inverters, storage, mounting systems
- Number of pallets or pieces and total weight
- For storage: watt-hours per battery and UN number from the data sheet
- Delivery point: warehouse, site or solar park
- Unloading: available on site or still to be clarified