Near Spremberg in Lusatia, a large battery storage system built from containers stands at the Schwarze Pumpe power plant site. The region in structural change shows how containerised storage connects to the grid – and what its transport requires.
Spremberg: economy and locations
Since 2020 a battery storage system with around 53 to 54 megawatt-hours of capacity and up to 50 megawatts of power has been operating at the Schwarze Pumpe site. It consists of 13 containers on an area of 110 by 62 metres.
Further storage systems are being built at power plant sites in Lusatia. For logistics this means: container storage under UN 3536, heavy single items, a crane at the standing area and long planning lead times.
Key facts
| Fact | Source |
|---|---|
| A large battery storage system has been operating at the Schwarze Pumpe power plant site since 2020 | Operator, project page (As of 2020) |
| The system has around 53–54 MWh capacity and up to 50 MW power | ZfK Zeitung für kommunale Wirtschaft |
| The system consists of 13 containers on an area of 110 × 62 metres | KuLaDig Kultur.Landschaft.Digital |
Typical shipments in Spremberg
- Storage containers under UN 3536 from port or plant to the site
- Transformers and compact stations for the grid connection
- Replacement modules for existing storage plants
Things to note on site
Power plant sites have gates, access rules and their own contacts. Container storage travels with orange plates and class 9 placards; access, standing area and crane are clarified in advance. We check per request whether a specific transport is feasible.
Questions and answers: Spremberg
Do you transport container storage to Lusatia?
We check per request whether a BESS container is feasible for us – depending on dimensions, weight, marking and unloading.
Which marking does a storage container need?
Under SP 389 orange plates and class 9 placards on two opposite sides, except where 1.1.3.6 applies.
Request
Request for Spremberg
Three steps. Anything you do not know yet can be left open.
Details for planning
- Collection and destination with country
- Preferred time frame
- Product group: modules, inverters, storage, mounting systems
- Number of pallets or pieces and total weight
- For storage: watt-hours per battery and UN number from the data sheet