Solar-Spedition

Goods

Transporting PV mounting systems

The substructure carries every plant: profiles, rails, ramming posts, tables and small parts in boxes. Long bundles and heavy posts need different vehicles and load securing than module pallets. We plan call-offs to match construction progress.

What matters

Long profiles
Beyond a certain length an open or longer vehicle is needed. We clarify overhang and length before choosing the vehicle.
Heavy bundles
Ramming posts and steel profiles are heavy and slide easily. Edge protection and enough lashing are a must.
Small parts count
Screws, clamps and connectors in boxes go missing easily. We check the packing list and package count at handover.
Call-off to site
The substructure comes before the modules. We agree the order of call-offs.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. What lengths and weights do the bundles have?
  2. How many packages and pallets?
  3. Open vehicle needed or is a curtainsider enough?
  4. How is unloading done on site?

What we need from you

  • Packing list with lengths and weights
  • Number of bundles, boxes, pallets
  • Call-off plan
  • Unloading

Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.

What we do for you

What we organise

  • Road transport for PV modules, inverters, mounting systems and battery storage across Europe
  • Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
  • For battery storage we clarify UN number, packaging and documents before quoting

Good to know

Over-length loads requiring permits are not part of this service; normal profile lengths are planned with a suitable vehicle.

How it works

  1. 01

    Request

    You send route, date, product group and quantity using the form – anything unknown can stay open.

  2. 02

    Review

    We check lengths, weights and unloading and choose vehicle and load securing.

  3. 03

    Quote

    You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.

  4. 04

    Execution

    Loading according to packing list, secured transport, delivery with package count check.

Questions and answers: Mounting systems

How long may profiles be for a normal truck?

That depends on the vehicle. Tell us the lengths from the packing list – we choose the suitable vehicle.

Do you deliver substructure and modules together?

That is possible if weight and deck space fit. Usually the substructure comes earlier in separate call-offs.

What happens if small parts are missing?

That is why we compare the package count at collection and handover. Note shortages on the delivery note.

Request

Request for this topic: Mounting systems

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Packing list with lengths and weights
  • Number of bundles, boxes, pallets
  • Call-off plan
  • Unloading

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date
Where is it delivered? (optional)

What is being transported?

Quantity
Total weight
Does the shipment contain lithium batteries?

For lithium batteries we clarify the UN number and documents after your request.

You can send data sheets or packing lists after our first reply – no upload is needed here.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.