Goods
Transporting solar cables and cable drums
From module strings to medium voltage: cables come on drums that are heavy and want to roll. We plan vehicle and securing by diameter and weight and clarify how unloading works on site.
What matters
- Secure against rolling
- Drums are secured against rolling with chocks or cradles and lashed down.
- Weight and diameter
- Both determine whether tail lift, forklift or crane is needed.
- Unloading
- Rolling a drum off the truck is not unloading. Equipment and procedure are clarified in advance.
- Empty drums
- Empty drums often go back to the manufacturer. Whether we take them, is set in the quote.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- How many drums, with what diameter and weight?
- How is unloading done?
- Should empty drums go back?
- Where exactly on site?
What we need from you
- Drum data
- Quantity and weight
- Unloading
- Return
Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.
What we do for you
What we organise
- Road transport for PV modules, inverters, mounting systems and battery storage across Europe
- Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
- For battery storage we clarify UN number, packaging and documents before quoting
Good to know
Large medium-voltage drums often need a crane or forklift – we check per request whether we can provide that.
How it works
- 01
Request
You send route, date, product group and quantity using the form – anything unknown can stay open.
- 02
Review
We check dimensions, weight and unloading and choose vehicle and securing.
- 03
Quote
You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.
- 04
Execution
Secured loading, transport, delivery at the agreed point.
Questions and answers: Cables and cable drums
How are cable drums secured in the truck?
With chocks or cradles against rolling and lashing against shifting – matched to weight and diameter.
Do you take empty drums back?
On request, if agreed in the quote and the drums are ready.
Is a crane needed for unloading?
For heavy drums often a crane or forklift. We clarify in advance what is possible on site.
Request
Request for this topic: Cables and cable drums
Three steps. Anything you do not know yet can be left open.
Details for planning
- Drum data
- Quantity and weight
- Unloading
- Return