Goods
Transporting central inverters and stations
Large solar farms use central inverters or complete stations – heavy, with a high centre of gravity and often movable only by crane. Based on dimensions and weight we check which vehicle fits and whether unloading on site is feasible.
What matters
- Centre of gravity and lifting points
- Stations have defined lifting points. We need a drawing or data sheet with the centre of gravity before planning.
- Crane at destination
- Usually the unit is set on a foundation by crane. We check per request whether we can provide a crane.
- Dimensions and permits
- If dimensions and weight stay within limits, a normal vehicle runs. Loads that need permits for size or weight are not part of this service.
- Access to the foundation
- Site road, bends and ground must carry vehicle and crane.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- What are the dimensions and weight of the station?
- Where are centre of gravity and lifting points?
- How is it unloaded – crane available or open?
- What is access to the foundation like?
What we need from you
- Drawing or data sheet
- Dimensions and weight
- Unloading and standing area
- Access
Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.
What we do for you
What we organise
- Road transport for PV modules, inverters, mounting systems and battery storage across Europe
- Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
- For battery storage we clarify UN number, packaging and documents before quoting
Good to know
If a station contains batteries or operating fluids, we clarify that in advance – it may trigger dangerous goods duties.
How it works
- 01
Request
You send route, date, product group and quantity using the form – anything unknown can stay open.
- 02
Review
We check dimensions, weight and unloading and clarify whether the transport is feasible without a permit and with reasonable effort.
- 03
Quote
You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.
- 04
Execution
After confirmed feasibility: loading at the lifting points, secured transport, handover at the agreed point.
Questions and answers: Central inverters and stations
Does an inverter station need heavy haulage?
That depends on dimensions and weight. Within limits a normal vehicle suffices; we do not handle loads that need permits for size or weight.
Can you set the station on the foundation?
We check per request whether a crane can be provided. Setting it on the foundation is then stated explicitly in the quote.
Which documents do you need?
Drawing or data sheet with dimensions, weight, centre of gravity and lifting points plus photos of the access.
Request
Request for this topic: Central inverters and stations
Three steps. Anything you do not know yet can be left open.
Details for planning
- Drawing or data sheet
- Dimensions and weight
- Unloading and standing area
- Access