Solar-Spedition

Goods

Transporting central inverters and stations

Large solar farms use central inverters or complete stations – heavy, with a high centre of gravity and often movable only by crane. Based on dimensions and weight we check which vehicle fits and whether unloading on site is feasible.

What matters

Centre of gravity and lifting points
Stations have defined lifting points. We need a drawing or data sheet with the centre of gravity before planning.
Crane at destination
Usually the unit is set on a foundation by crane. We check per request whether we can provide a crane.
Dimensions and permits
If dimensions and weight stay within limits, a normal vehicle runs. Loads that need permits for size or weight are not part of this service.
Access to the foundation
Site road, bends and ground must carry vehicle and crane.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. What are the dimensions and weight of the station?
  2. Where are centre of gravity and lifting points?
  3. How is it unloaded – crane available or open?
  4. What is access to the foundation like?

What we need from you

  • Drawing or data sheet
  • Dimensions and weight
  • Unloading and standing area
  • Access

Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.

What we do for you

What we organise

  • Road transport for PV modules, inverters, mounting systems and battery storage across Europe
  • Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
  • For battery storage we clarify UN number, packaging and documents before quoting

Good to know

If a station contains batteries or operating fluids, we clarify that in advance – it may trigger dangerous goods duties.

How it works

  1. 01

    Request

    You send route, date, product group and quantity using the form – anything unknown can stay open.

  2. 02

    Review

    We check dimensions, weight and unloading and clarify whether the transport is feasible without a permit and with reasonable effort.

  3. 03

    Quote

    You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.

  4. 04

    Execution

    After confirmed feasibility: loading at the lifting points, secured transport, handover at the agreed point.

Questions and answers: Central inverters and stations

Does an inverter station need heavy haulage?

That depends on dimensions and weight. Within limits a normal vehicle suffices; we do not handle loads that need permits for size or weight.

Can you set the station on the foundation?

We check per request whether a crane can be provided. Setting it on the foundation is then stated explicitly in the quote.

Which documents do you need?

Drawing or data sheet with dimensions, weight, centre of gravity and lifting points plus photos of the access.

Request

Request for this topic: Central inverters and stations

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Drawing or data sheet
  • Dimensions and weight
  • Unloading and standing area
  • Access

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm Berlin time (CET/CEST)

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date
Where is it delivered? (optional)

What is being transported?

Quantity
Total weight
Does the shipment contain lithium batteries?

For lithium batteries we clarify the UN number and documents after your request.

You can send data sheets or packing lists after our first reply – no upload is needed here.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.