City · Spain
Solar farm logistics in the Seville area
Near Seville in Andalusia, the world's first commercial solar tower plants went on line. The region still stands for large solar projects – and for sites far from the ports and warehouses of central Europe.
Seville: economy and locations
In Sanlúcar la Mayor near Seville the world's first commercial solar tower plant went into operation in 2007; in 2009 a second with 20 megawatts followed at the same site. The solar platform there combines several technologies, including tower plants and photovoltaics.
For logistics, projects in Andalusia mean long trips from central Europe or short routes from the Spanish ports. On sites, access via field tracks, summer heat and agreed delivery windows count.
Key facts
| Fact | Source |
|---|---|
| Near Seville (Sanlúcar la Mayor) the world's first commercial solar tower plant went into operation in 2007 | Renewable Energy Magazine (As of 2007) |
| A second, larger 20 MW tower plant followed at the same site in 2009 | NREL SolarPACES (archive) (As of 2009) |
| The solar platform there combines several solar technologies, including tower plants and photovoltaics | Wikiwand, Solar Platform |
Typical shipments in Seville
- Module pallets from Germany to a solar farm in Andalusia
- Mounting structures as a full load to the site
- Inverters and replacement units for existing plants
Things to note on site
Many project areas lie outside towns and can only be reached via field tracks; entrance coordinates and photos help choose the vehicle. From central Europe the trips via France take several days. We check per request whether delivery is feasible for your project.
Questions and answers: Seville
Do you deliver modules to solar farms near Seville?
On request, yes. Access, delivery window and unloading are clarified in advance with site management.
How long does transport from Germany to Andalusia take?
Several days, depending on route and driving times. We state a realistic schedule in the quote.
Request
Request for Seville
Three steps. Anything you do not know yet can be left open.
Details for planning
- Collection and destination with country
- Preferred time frame
- Product group: modules, inverters, storage, mounting systems
- Number of pallets or pieces and total weight
- For storage: watt-hours per battery and UN number from the data sheet
- Delivery point: warehouse, site or solar park
- Unloading: available on site or still to be clarified