City · Poland
Battery cell and storage transport from Wrocław
Near Wrocław in Lower Silesia stands one of Europe's largest lithium-ion cell plants. Cells and modules from here go to vehicle and storage manufacturers – and therefore travel by road as class 9 dangerous goods.
Wrocław: economy and locations
The cell plant in Biskupice Podgórne near Wrocław has an annual capacity of around 86 gigawatt-hours and is also to manufacture cells for stationary energy storage. In 2022 Poland had the world's second-largest lithium-ion battery production capacity at 73 gigawatt-hours.
For the storage industry the region is thus a source of cells and modules that integrators in Germany and central Europe build into storage systems.
Key facts
| Fact | Source |
|---|---|
| Near Wrocław (Biskupice Podgórne) stands one of Europe's largest lithium-ion cell plants, with around 86 GWh annual capacity | XYZ.pl |
| The plant is also to manufacture cells for stationary energy storage | Invest in Wrocław |
| In 2022 Poland had the world's second-largest lithium-ion production capacity at 73 GWh | Notes from Poland (As of 2022) |
Typical shipments in Wrocław
- Battery modules as UN 3480 to a storage integrator in Germany
- Cells in P903 packaging to a plant in the Czech Republic
- Empties and load carriers back to Lower Silesia
Things to note on site
The plant lies in the city's surroundings with motorway links towards Germany. Larger cell and module shipments quickly exceed 333 kg battery mass per transport unit – then with orange plates and an ADR-trained driver. We check per request whether that is feasible for your shipment.
Questions and answers: Wrocław
Do you transport battery cells from Wrocław to Germany?
Series goods tested to UN 38.3 as UN 3480 under ADR; feasibility with a dangerous goods vehicle is checked per request.
What do you need for cell transports?
Data sheet, UN 38.3 test summary, battery mass, packaging type and the plants' loading and unloading times.
Request
Request for Wrocław
Three steps. Anything you do not know yet can be left open.
Details for planning
- Collection and destination with country
- Preferred time frame
- Product group: modules, inverters, storage, mounting systems
- Number of pallets or pieces and total weight
- For storage: watt-hours per battery and UN number from the data sheet
- Delivery point: warehouse, site or solar park
- Unloading: available on site or still to be clarified