Services
Full or part load for solar panels
Whether a whole truck runs for your modules or part of the deck is enough depends on pallet count, weight and the number of unloading points. We propose the right load type and explain what it means for date and handling.
What matters
- Pallet spaces and weight
- Modules often reach the permitted weight before the pallet spaces. We therefore calculate with weight and floor area together.
- Direct or with other cargo
- A full load runs without transhipment. Part loads share the deck – additional cargo only without moving the modules and as agreed.
- Several consignees
- Several unloading points on one trip are possible but take time. We agree the sequence with you.
- Side or rear loading
- Whether loading is from the side by forklift or via the dock affects the choice of vehicle.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- How many pallets and what total weight?
- One or several unloading points?
- Must the goods run directly without transhipment?
- Is loading and unloading at a dock, from the side by forklift or by tail lift?
What we need from you
- Pallet count, dimensions and weight
- Loading and unloading points
- Preferred time frame
- Loading and unloading equipment
Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.
What we do for you
What we organise
- Road transport for PV modules, inverters, mounting systems and battery storage across Europe
- Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
- For battery storage we clarify UN number, packaging and documents before quoting
Good to know
For part loads the quote states whether and how other cargo is added. Modules are not transhipped.
How it works
- 01
Request
You send route, date, product group and quantity using the form – anything unknown can stay open.
- 02
Review
We calculate pallet spaces and weight, check loading and unloading equipment and propose a full or part load.
- 03
Quote
You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.
- 04
Execution
Loading according to plan, transport without moving the modules, delivery at the agreed points.
Questions and answers: Full and part loads
When is a full load worthwhile?
When weight or pallet count fills most of the vehicle or the goods should run directly without further stops.
Are modules transhipped on part loads?
No, we do not tranship modules. Other shipments are added only if the module pallets remain untouched, and as agreed.
Can one truck serve several installers?
Yes, several unloading points on one trip are possible. Sequence and time windows are agreed in advance.
Request
Request for this topic: Full and part loads
Three steps. Anything you do not know yet can be left open.
Details for planning
- Pallet count, dimensions and weight
- Loading and unloading points
- Preferred time frame
- Loading and unloading equipment