Transport for commercial and industrial rooftops
On halls and commercial roofs, building happens while operations continue below. Deliveries must fit into yard traffic, standing areas for cranes or lifts are scarce. We agree delivery and unloading with you and the building operator.
What matters
- Ongoing operations
- Delivery outside the business's main loading times relieves the yard. We agree the window.
- Dock or ground level
- With a dock it is simple; without one, tail lift, forklift or crane count.
- Lifting to the roof
- Lifting to the roof is done by your installation team. We deliver to the agreed point on the ground.
- Commercial battery
- If a battery comes along, battery mass and marking must be clarified.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- When is the yard free for deliveries?
- Dock, forklift or ground level?
- Where is the unloading point for the installation team?
- Is a commercial battery included?
What we need from you
- Address and yard access
- Goods and weights
- Unloading
- Contacts at the business and installer
Preparation: You hand over the goods ready for shipping in the manufacturer's packaging; for storage systems the data sheet with watt-hours and UN number is available. We check per request whether special cases such as a crane or a dangerous goods vehicle are feasible.
What we do for you
What we organise
- Road transport for PV modules, inverters, mounting systems and battery storage across Europe
- Planning by pallet count, weight, loading and unloading point – for warehouses, wholesalers and sites
- For battery storage we clarify UN number, packaging and documents before quoting
Good to know
Roof lifting and placement are not part of transport. We check per request whether we can provide a crane.
How it works
- 01
Request
You send route, date, product group and quantity using the form – anything unknown can stay open.
- 02
Review
We check time window, access and unloading and coordinate them with the business and installation team.
- 03
Quote
You receive a quote with the agreed scope – unloading, waiting time and dangerous goods questions are stated explicitly.
- 04
Execution
Delivery in the agreed window, unloading at the agreed point, signature.
Questions and answers: Commercial rooftops
Do you deliver during operations?
Yes, in an agreed window that does not block yard traffic.
Do you lift the modules onto the roof?
No, we deliver to the agreed point on the ground. Lifting is done by the installation team.
What applies to a commercial battery in the delivery?
It remains class 9 dangerous goods. We check battery mass, packaging and marking before quoting.
Request
Request for this topic: Commercial rooftops
Three steps. Anything you do not know yet can be left open.
Details for planning
- Address and yard access
- Goods and weights
- Unloading
- Contacts at the business and installer